Bid Packages and Trade Scopes.
Your bid set, organized the day it arrives.
Do we have every document? Is every trade covered? ARK registers every document, splits the scope into trade packages and puts every quote into the same format.

Every document in. Every change caught. Every quote read.
Nothing missing
Every drawing and spec section is logged and checked against the index on day one.
Nothing out of date
ARK Watcher flags each addendum when it lands and shows which packages and estimate lines it changes.
Nothing lost from a quote
Every quote is read word for word, and the exclusions are kept.
1
Bid package managementWhat is bid package management, and what does ARK do with it?
Bid package management is the work of turning a bid set into priced trade packages: registering every drawing and specification section, tracking each addendum, splitting the scope between trades and reading the quotes that come back. ARK does this on day one. It registers the bid set, traces each addendum to the estimate lines it changes, assigns every section to one trade package and flags items that fall between two, and turns each subcontractor quote into structured data with the exclusions kept word for word.
2
What it costs youWhat a disorganized bid set costs you
A bid set can arrive as hundreds of drawings and spec sections, and an addendum can change some of them days before the deadline.
Scope is split into trade packages, and items that sit between two trades become gaps on site that you pay to fill. Quotes come back in whatever format the subcontractor uses and get re-keyed by hand, and the exclusions get lost on the way.
3
What ARK does, step by stepHow ARK organizes a bid set
Registers the bid set
Logs each sheet and section and checks the set against its index.
Traces each addendum
Compares each addendum with what it replaces and links the change to the packages and estimate lines it touches.
Splits scope
Assigns every section to exactly one trade package and marks boundary items on both scope sheets.
Structures every quote
Extracts price, validity, inclusions and exclusions word for word, and flags quotes received after the cutoff.
Your team decides: The Senior Estimator reviews the scope sheets before issue.
4
See it on a live projectAsk ARK, and get the source with the answer.
Ask ARK
“What did addendum 2 change, and which packages and estimate lines does it affect?”
ARK returns
Elevator specification rev B, drawing S-301 rev C and bid form alternate 2. Affects the elevator and structural steel packages.
Short walkthroughs of ARK.
5
Ask yourselfWhen addendum three lands on a Friday afternoon, how do you find every estimate line it touches?
6
What ARK reads, and who it is forWhat ARK reads
- Your bid drawings, specs and addenda, in the bid portal or your CDE.
- Your trade package template, in your document storage.
- Quotes with the time received, from email, bid portals or procurement platforms.
Who it’s for
Chief EstimatorA complete, indexed bid set on day one, with the addenda traced.
Senior EstimatorScope sheets with every section assigned once and boundary items marked.
Preconstruction ManagerEvery quote in the same format, exclusions kept, late quotes flagged.
Estimating CoordinatorThe register and quote log kept by ARK, not re-keyed.
7
What feeds it and what it feedsWhere this sits in the project
- 1TenderBid Packages and Trade Scopes
- 2PreconstructionEstimating and Cost Intelligence
- 3Contract AwardContract De-Risking Before Signature
- 4ConstructionSubmittal Reviews and RFI Watch · Quality Before Cover-Up
- 5Commercial ControlClaims Support and Evidence Record · Closing the Cost Loop
- 6Handover and Close-outCommissioning Readiness and Handover Data
The Foundation feeds it the current bid set. Its structured bid data feeds Estimating and Cost Intelligence. Back to What ARK Does
8
FAQ