Protect your margin.
Catch it while the money is still recoverable.
Much of the margin a project loses is never decided by anyone. It slips through the gaps between your systems: the change nobody raised, the submittal approved against the old spec, the forecast that knew in February. ARK reads the whole record and helps you catch it in time.

Margin is not only spent. It leaks. Here is where, stage by stage.
Changes caught
The changes already sitting in your correspondence, with the instruction cited and the claim deadline tracked.
Rework cut
Every submittal checked against the current revision, and inspections confirmed before work is covered.
Margin seen the week it moves
With the cause and the record attached, not at final account.
Two ways to lose margin. Only one shows up on time.
Spent margin is a decision somebody made.
You absorbed a redesign to keep the owner. You accepted a low quote because the schedule needed the trade on site. You priced a risk and the risk arrived. Somebody owned it, and it shows in the forecast the month it happens.
Leaked margin is different. Nobody decided it.
An instruction arrived in an email on a Thursday afternoon, added two days to a subcontractor’s scope, and was never raised as a change. A submittal was reviewed carefully against a specification that an addendum had superseded the week before. A quote came in 28% below the field, was carried as a saving, and had left out the box gutters. Everyone did their job. The leak happened in the gap between two people’s jobs, and it showed up at final account, months after the notice period closed.
ARK is built for the second kind. It reads across your systems, so those gaps are where it looks first.
Six handoffs. Six places the money goes.
Tender
The addendum that changed three drawings two days before close, and the estimate lines nobody re-priced. ARK traces every addendum to the packages and estimate lines it touches.
Preconstruction
The rate that came from memory and the subtotal that was keyed. ARK checks every rate against your own closed projects and finds the unpriced, doubled and mistyped lines before the bid.
Contract Award
The execution copy that differed from your last reviewed turn. Payment moved from 30 to 45 days and nobody agreed to it. ARK compares the signing version against the last turn you reviewed and tests the terms against the price.
Construction
The RFI answer that directed extra work in one sentence, and the slab poured over a hold point nobody released. ARK Watcher flags answers that add scope the day they arrive and alerts before work is covered without its inspection.
Commercial Control
The claim that failed on notice rather than merit, because the daily report for that day was never written, and the margin bridge built from memory at final account. ARK chases the site record daily, tests every notice rule before the claim goes, and builds the bridge as the job runs.
Handover and Close-out
The handover package the owner sends back, and the final payment and retention held until it is fixed. ARK confirms each system is ready before a test is booked, builds the asset register as scopes complete, and feeds the real costs from the closed job back to the next bid.
The forecast knew in February. Nobody asked it.
On many jobs that finish well below bid, the forecast showed the first movement months before anyone acted. Forecast 9 dipped below 5.5%. It was explained as timing. Forecast 10 was explained as buyout. By forecast 12 it was a trend, the subcontracts were let, the notice periods had closed, and the only lever left was the final account.
Ask ARK
“Explain the margin movement from bid to final on this project.”
ARK returns
6.5% to 4.0% in six steps, led by the absorbed Level 3 redesign and slab productivity, with the month each movement first appeared and the change order, RFI or drawing revision behind it.
Why it matters
A margin bridge built at the end explains what happened. One built as the job runs gives the project team time to act.
ARK Watcher keeps the bridge current every week, so the first movement is a question you can answer the month it appears, not at final account.
Can your team answer these today, in under an hour?
- What has changed on this job since last week, and what does each change touch: which trades, which cost codes, which schedule activities, which notice periods?
- Which of those changes is extra work you have not yet claimed, and how many days are left to claim it?
- Where is the margin today against bid, step by step, with each step tied to a record somebody can open?
If it takes a week and three people, the margin is still leaking and you will find out where at final account. With ARK, each one is a question you can ask and get an answer to, with the documents attached.
Frequently asked questions
Related: Claims Support and Evidence RecordClosing the Cost LoopContract De-Risking Before Signature
See where the margin is going on your own project.
Bring a live job. ARK builds the margin bridge from your record within days.