Protect your margin.
Catch it while the money is still recoverable.

Much of the margin a project loses is never decided by anyone. It slips through the gaps between your systems: the change nobody raised, the submittal approved against the old spec, the forecast that knew in February. ARK reads the whole record and helps you catch it in time.

Forecast 9 · Feb · first below 5.5%RFI-118 · adds scope · unclaimedPayment · 30 to 45 days · unagreed
See where your margin leaks
Commercial control illustration from the ARK value chain
Margin protected

Margin is not only spent. It leaks. Here is where, stage by stage.

Changes caught

The changes already sitting in your correspondence, with the instruction cited and the claim deadline tracked.

Rework cut

Every submittal checked against the current revision, and inspections confirmed before work is covered.

Margin seen the week it moves

With the cause and the record attached, not at final account.

Spent or leaked

Two ways to lose margin. Only one shows up on time.

Spent margin is a decision somebody made.

You absorbed a redesign to keep the owner. You accepted a low quote because the schedule needed the trade on site. You priced a risk and the risk arrived. Somebody owned it, and it shows in the forecast the month it happens.

Leaked margin is different. Nobody decided it.

An instruction arrived in an email on a Thursday afternoon, added two days to a subcontractor’s scope, and was never raised as a change. A submittal was reviewed carefully against a specification that an addendum had superseded the week before. A quote came in 28% below the field, was carried as a saving, and had left out the box gutters. Everyone did their job. The leak happened in the gap between two people’s jobs, and it showed up at final account, months after the notice period closed.

ARK is built for the second kind. It reads across your systems, so those gaps are where it looks first.

Where margin leaks at each handoff

Six handoffs. Six places the money goes.

  • Tender

    The addendum that changed three drawings two days before close, and the estimate lines nobody re-priced. ARK traces every addendum to the packages and estimate lines it touches.

    Bid Packages and Trade Scopes

  • Preconstruction

    The rate that came from memory and the subtotal that was keyed. ARK checks every rate against your own closed projects and finds the unpriced, doubled and mistyped lines before the bid.

    Estimating and Cost Intelligence

  • Contract Award

    The execution copy that differed from your last reviewed turn. Payment moved from 30 to 45 days and nobody agreed to it. ARK compares the signing version against the last turn you reviewed and tests the terms against the price.

    Contract De-Risking Before Signature

  • Construction

    The RFI answer that directed extra work in one sentence, and the slab poured over a hold point nobody released. ARK Watcher flags answers that add scope the day they arrive and alerts before work is covered without its inspection.

    Submittal Reviews and RFI Watch · Quality Before Cover-Up

  • Commercial Control

    The claim that failed on notice rather than merit, because the daily report for that day was never written, and the margin bridge built from memory at final account. ARK chases the site record daily, tests every notice rule before the claim goes, and builds the bridge as the job runs.

    Claims Support and Evidence Record · Closing the Cost Loop

  • Handover and Close-out

    The handover package the owner sends back, and the final payment and retention held until it is fixed. ARK confirms each system is ready before a test is booked, builds the asset register as scopes complete, and feeds the real costs from the closed job back to the next bid.

    Commissioning Readiness and Handover Data

The forecast knew in February

The forecast knew in February. Nobody asked it.

On many jobs that finish well below bid, the forecast showed the first movement months before anyone acted. Forecast 9 dipped below 5.5%. It was explained as timing. Forecast 10 was explained as buyout. By forecast 12 it was a trend, the subcontracts were let, the notice periods had closed, and the only lever left was the final account.

Ask ARK

“Explain the margin movement from bid to final on this project.”

ARK returns

6.5% to 4.0% in six steps, led by the absorbed Level 3 redesign and slab productivity, with the month each movement first appeared and the change order, RFI or drawing revision behind it.

Forecast 9 · Feb · 5.4%CO-07 · Level 3 redesignSlab · productivity · 0.8%

Why it matters

A margin bridge built at the end explains what happened. One built as the job runs gives the project team time to act.

ARK Watcher keeps the bridge current every week, so the first movement is a question you can answer the month it appears, not at final account.

Ask yourself

Can your team answer these today, in under an hour?

  • What has changed on this job since last week, and what does each change touch: which trades, which cost codes, which schedule activities, which notice periods?
  • Which of those changes is extra work you have not yet claimed, and how many days are left to claim it?
  • Where is the margin today against bid, step by step, with each step tied to a record somebody can open?

If it takes a week and three people, the margin is still leaking and you will find out where at final account. With ARK, each one is a question you can ask and get an answer to, with the documents attached.

FAQ

Frequently asked questions

Rarely in one decision. It leaks between systems: extra work in emails that was never claimed, submittals approved against a superseded specification, low quotes that left out scope, and late contract edits nobody agreed. ARK reads across those systems and flags each one with the document cited.
ARK Watcher flags RFI answers that add scope the day they arrive, checks every submittal against the specification revision that governs today, alerts before work is covered without its inspection, and watches the claim deadlines in the contract.
Yes. Ask for the margin bridge and ARK returns each step from bid to current forecast, the month it first appeared, and the change order, RFI or drawing revision behind it.
No. ARK reads your job cost system or ERP in place and checks what moves through it.

Related: Claims Support and Evidence RecordClosing the Cost LoopContract De-Risking Before Signature