Ageiro ARK, the Project Intelligence Platform for AECO
Construction

Submittal Reviews and RFI Watch.
Nothing approved by accident.

Is the work built as approved? ARK checks every submittal against the specification that governs today, prepares every RFI from the whole record, and ARK Watcher keeps the clock on every open item.

SUB-114 · Spec 23 73 13RFI-118 · answered 12 MarOpen items · aged in working days
See ARK check your submittals
Construction stage illustration
Rework avoided

Every submittal checked. Every RFI answered once. Every open item on the clock.

Checked against today’s spec

Each clause is matched to the submittal, page cited: complies, deviates or not addressed.

Answered once

ARK tells you when an RFI has already been answered, with the governing clauses and sheets attached.

On the clock

ARK Watcher ages every open item in working days, names whose court it is in, and flags answers that direct extra work.

1

Submittal review and RFI tracking

What is submittal review, and what does ARK do with it?

Submittal review is checking a subcontractor’s proof that their product meets the specification, against the specification as it stands today, including every RFI answer that changed it. ARK checks each submittal clause by clause against the governing revision, prepares new RFIs with the governing documents attached and tells you when the question has been answered before, and ARK Watcher ages every open RFI and submittal in working days with the ball-in-court named.

2

What it costs you

What a missed submittal or a slow RFI costs you

Engineers check dozens of submittals by hand against long specs and every RFI answer that changed them since bid. Errors get installed.

RFIs sit in inboxes. Some answers add unpriced work in one polite sentence, and nobody raises it as a change.

3

What ARK does, step by step

How ARK reviews submittals and watches RFIs

  1. Reads today’s spec

    Finds the governing specification at its latest revision, and every RFI answer or direction that has changed it since bid.

  2. Checks every clause

    Matches each clause to the submittal, page cited. Checks certificates cover the exact model offered.

  3. Prepares new RFIs

    Gathers the governing clauses, sheets and earlier answers, and tells you if the question has already been answered.

  4. Watches the clock

    ARK Watcher ages each open item in working days against the contract, says who acts next, and flags answers that direct extra work.

Your team decides: The Project Engineer accepts or edits the comments and the outcome. The Project Manager approves rejections.

4

See it on a live project

Ask ARK, and get the source with the answer.

Ask ARK

“Review SUB-114 round 2 against spec 23 73 13.”

ARK returns

Revise and resubmit. Fan pressure 580 Pa against 650 required, compliance statement missing, fire certificate covers a different model.

Spec 23 73 13 · clause 2.4SUB-114 · page 7Certificate · model mismatch

Ask ARK

“What is overdue on RFIs and submittals, and whose court is it in?”

ARK returns

The register aged in working days per the contract, including the items that are yours.

RFI-121 · 9 working days · ownerSUB-130 · 4 working days · oursContract · 10-day review period
Why submittal problems show up on site, not in the review2 minutes. A services submittal checked clause by clause against the governing spec.Video Library
Why your team keeps answering the same RFI twice2 minutes. ARK finds the earlier answer and the clauses behind it before the RFI goes out.Video Library

5

Ask yourself

How many review rounds does a typical services submittal take on your jobs, and how often does the installed product turn out to differ from what was approved?

6

What ARK reads, and who it is for

What ARK reads

  • Specs and drawings with their revisions, in your CDE.
  • Submittals and certificates, in your CDE or project management platform.
  • The RFI register and responses.
  • The contract review period and schedule need-by dates, in your scheduling software.

Who it’s for

Project EngineerEvery submittal pre-checked clause by clause, with the page cited, before the review.

Design ManagerRFIs that arrive with the governing documents attached and the earlier answer found.

Project ManagerEvery open item aged against the contract, with whose court it is in.

SuperintendentApproved products that match what arrives on site.

7

What feeds it and what it feeds

Where this sits in the project

  1. 1TenderBid Packages and Trade Scopes
  2. 2PreconstructionEstimating and Cost Intelligence
  3. 3Contract AwardContract De-Risking Before Signature
  4. 4ConstructionSubmittal Reviews and RFI Watch · Quality Before Cover-Up
  5. 5Commercial ControlClaims Support and Evidence Record · Closing the Cost Loop
  6. 6Handover and Close-outCommissioning Readiness and Handover Data

The Foundation feeds it the current specification and drawings. Approved products feed Quality Before Cover-Up, makes and models feed Commissioning Readiness and Handover Data, and RFI answers that add scope feed Claims Support and Evidence Record. Back to What ARK Does

8

FAQ

Submittal Reviews and RFI Watch questions

The latest specification revision and every RFI answer or direction that amended it since tender.
No. Your Project Engineer accepts or edits the outcome, and your Project Manager approves rejections.
It flags answers that direct extra work as possible changes as they arrive, for your team to assess.
ARK enforces zero data retention with all AI providers. Your documents and queries are never used to train models. See Security & Trust.

See ARK review your next submittal within days.