Closing the Cost Loop.
Know why the margin moved, and when you knew.

Where is the margin going? ARK tracks your buyout against budget every week, explains every step of the margin movement with evidence, and feeds your real costs into the next bid.

Forecast 9 · Feb · first below 5.5%Roofing · late · 42,000 overCO-12 · approved, not posted
See ARK explain your margin
Commercial Control stage illustration
Margin understood

Every package tracked. Every margin move explained. Every real cost fed back.

Buyout tracked weekly

Bought against budget per cost code every week, with ARK Watcher flagging trades that are late or over budget.

Margin explained

A bridge from bid margin to final margin, each step tied to a cause and a record, with the month the forecast first showed it.

Real costs fed back

Final costs turned into unit rates per your standard and passed to your estimators for review.

1

Buyout and margin

What is a margin bridge, and what does ARK do with it?

A margin bridge is a step-by-step explanation, backed by records, of how profit moved from the bid figure to the final figure, and when the forecast first showed each step. ARK compares bought against budget by cost code every week, builds the bridge with each step tied to a record, reconciles the final account against the contract’s approval rules, and turns actual costs into benchmark rates for your next bid.

2

What it costs you

What an unexplained margin costs you

Buyout is when you place the subcontracts after award, and the savings you make there erode without anyone noticing. At the end the margin has dropped and nobody can show why, step by step, or when the forecast first showed it.

Your board gets a story instead of evidence, and the project’s real costs never reach your next bid.

3

What ARK does, step by step

How ARK closes the cost loop

  1. Tracks buyout weekly

    Compares bought against budget per cost code, projects unbought packages from the best quote, and flags trades that are late or over budget.

  2. Explains the margin

    Builds a bridge from bid to final margin, each step tied to a cause and a record, and shows when each movement first appeared.

  3. Reconciles the final account

    Tests every adjustment against the contract’s approval rules, lists the unapproved ones and indexes the evidence.

  4. Feeds the next bid

    Turns final costs into unit rates per your standard, separates base and change scope, and passes them to estimating for review.

Your team decides: Your Commercial Manager owns the numbers. Your Preconstruction Manager accepts new benchmarks.

4

See it on a live project

Ask ARK, and get the source with the answer.

Ask ARK

“Explain the margin movement from bid to final on Marrow Street.”

ARK returns

6.5% to 4.0% in six steps, led by the absorbed Level 3 redesign and slab productivity. Forecast 9 in February was the first to fall below 5.5%.

Forecast 9 · Feb · 5.4%CO-07 · Level 3 redesign · absorbedSlab · productivity · 0.8%
Closing the cost loop with ARK2 minutes. Where margin went and when it was first visible, with evidence, and how real costs feed the next bid.Video Library

5

Ask yourself

On your last closed project, can you show the bridge from bid margin to final margin, and the month the forecast first moved?

6

What ARK reads, and who it is for

What ARK reads

  • Budgets, actuals and forecasts, in your job cost system.
  • Buyout schedule and leveled quotes, in your procurement platform or spreadsheets.
  • Change order and extension of time registers, in your CDE or project management platform.
  • Pay applications, certificates and allowances.
  • Your estimating standard and benchmarks.

Who it’s for

Commercial ManagerBuyout against budget every week, and the margin bridge built as the job runs.

Project AccountantA final account tested against the approval rules, with the evidence indexed.

Preconstruction ManagerReal costs from closed jobs, normalized to your standard, ready to accept as benchmarks.

PresidentWhy the margin moved, step by step, and when the forecast first showed it.

7

What feeds it and what it feeds

Where this sits in the project

  1. 1TenderBid Packages and Trade Scopes
  2. 2PreconstructionEstimating and Cost Intelligence
  3. 3Contract AwardContract De-Risking Before Signature
  4. 4ConstructionSubmittal Reviews and RFI Watch · Quality Before Cover-Up
  5. 5Commercial ControlClaims Support and Evidence Record · Closing the Cost Loop
  6. 6Handover and Close-outCommissioning Readiness and Handover Data

Claims Support and Evidence Record feeds the event files and Contract De-Risking Before Signature feeds the signed terms. Actual costs feed Estimating and Cost Intelligence for your next bid. See also Protect your margin. Back to What ARK Does

8

FAQ

Closing the Cost Loop questions

A step-by-step explanation, backed by records, of how profit moved from the bid figure to the final figure, with the month the forecast first showed it.
From the first weekly buyout comparison, as soon as subcontracts start being placed.
Yes. They are normalized to your estimating standard and staged for your Preconstruction Manager to accept as benchmarks.
ARK enforces zero data retention with all AI providers. Your documents and queries are never used to train models. See Security & Trust.

See ARK build the margin bridge on your last closed project.