Quality Before Cover-Up.
Inspected before it is covered.
Is it inspected before it is covered? ARK reads next week’s look-ahead, finds the work about to be covered, and checks its inspection has passed before the pour, the lining or the close-up.

Every hold point checked. Every test result compared. Every delivery matched.
Hold points checked
Every hold and witness point for the location has a Pass record, or ARK Watcher alerts before the work is covered.
Results compared
Test results are matched to the plan’s criteria with both values shown, and open non-conformances aged against your rule.
Deliveries matched
Delivery dockets and nameplate photos are compared with the approved submittal, and substitutions flagged at the gate.
1
Hold point and inspection trackingWhat is hold point tracking, and what does ARK do with it?
Hold point tracking is making sure the checks on the inspection and test plan have passed before work is covered: the pour, the lining, the close-up. ARK reads your three-week look-ahead, finds every pour, lining and close-up, confirms the hold and witness points for that location have passed, ages open non-conformances, and checks deliveries against the approved submittal at the gate.
2
What it costs youWhat a missed inspection costs you
An inspection and test plan lists the checks that must pass before work continues. Some are hold points, where nothing proceeds until an inspector signs. Miss one and a slab gets poured over uninspected steel.
Skip a delivery check and the wrong product turns up at handover. Tearing out finished work costs weeks. Catching it at the gate costs a phone call.
3
What ARK does, step by stepHow ARK checks quality before cover-up
Reads the look-ahead
Picks out every pour, lining or close-up in the three-week look-ahead, by level, zone and grid.
Checks for sign-off
Confirms each hold and witness point for that location has a Pass record. ARK Watcher alerts before the work is covered.
Matches the results
Compares test results with the plan’s criteria, showing both values. Ages every open non-conformance against your rule.
Checks deliveries
Compares make and model on dockets and nameplate photos with the approved submittal, and flags substitutions.
Your team decides: The Superintendent acts on the alert. Only the nominated inspector releases a hold point.
4
See it on a live projectAsk ARK, and get the source with the answer.
Ask ARK
“Run the QC conformance check on the look-ahead for the week of September 22.”
ARK returns
Do not pour. Thursday’s Level 2 slab, zone 2B, has no pre-pour release. NCR-008 concrete at 36.1 MPa against 40, open 21 days.
5
Ask yourselfWhen did you last tear out finished work because an inspection record was missing, and who found it?
6
What ARK reads, and who it is forWhat ARK reads
- Inspection and test plans and records, in your project management platform or inspection app.
- The NCR register, in your project management platform or CDE.
- The three-week look-ahead, in your scheduling software or spreadsheets.
- Approved submittals, delivery dockets and site photos.
Who it’s for
SuperintendentAn alert before the pour, not a tear-out after it.
Project EngineerTest results against the plan’s criteria, both values shown.
Quality ManagerEvery open non-conformance aged against your rule, and every delivery checked at the gate.
Project ManagerFewer tear-outs, and the inspection record complete at handover.
7
What feeds it and what it feedsWhere this sits in the project
- 1TenderBid Packages and Trade Scopes
- 2PreconstructionEstimating and Cost Intelligence
- 3Contract AwardContract De-Risking Before Signature
- 4ConstructionSubmittal Reviews and RFI Watch · Quality Before Cover-Up
- 5Commercial ControlClaims Support and Evidence Record · Closing the Cost Loop
- 6Handover and Close-outCommissioning Readiness and Handover Data
Submittal Reviews and RFI Watch feeds the approved products. Inspection and delivery records feed Commissioning Readiness and Handover Data. Back to What ARK Does
8
FAQ