Ageiro ARK, the Project Intelligence Platform for AECO
Construction

Quality Before Cover-Up.
Inspected before it is covered.

Is it inspected before it is covered? ARK reads next week’s look-ahead, finds the work about to be covered, and checks its inspection has passed before the pour, the lining or the close-up.

Level 2 slab · zone 2B · no releaseNCR-008 · 36.1 MPa vs 40AHU · AV-2100 delivered, AV-2200 approved
See ARK check your hold points
Construction stage illustration
Fewer tear-outs

Every hold point checked. Every test result compared. Every delivery matched.

Hold points checked

Every hold and witness point for the location has a Pass record, or ARK Watcher alerts before the work is covered.

Results compared

Test results are matched to the plan’s criteria with both values shown, and open non-conformances aged against your rule.

Deliveries matched

Delivery dockets and nameplate photos are compared with the approved submittal, and substitutions flagged at the gate.

1

Hold point and inspection tracking

What is hold point tracking, and what does ARK do with it?

Hold point tracking is making sure the checks on the inspection and test plan have passed before work is covered: the pour, the lining, the close-up. ARK reads your three-week look-ahead, finds every pour, lining and close-up, confirms the hold and witness points for that location have passed, ages open non-conformances, and checks deliveries against the approved submittal at the gate.

2

What it costs you

What a missed inspection costs you

An inspection and test plan lists the checks that must pass before work continues. Some are hold points, where nothing proceeds until an inspector signs. Miss one and a slab gets poured over uninspected steel.

Skip a delivery check and the wrong product turns up at handover. Tearing out finished work costs weeks. Catching it at the gate costs a phone call.

3

What ARK does, step by step

How ARK checks quality before cover-up

  1. Reads the look-ahead

    Picks out every pour, lining or close-up in the three-week look-ahead, by level, zone and grid.

  2. Checks for sign-off

    Confirms each hold and witness point for that location has a Pass record. ARK Watcher alerts before the work is covered.

  3. Matches the results

    Compares test results with the plan’s criteria, showing both values. Ages every open non-conformance against your rule.

  4. Checks deliveries

    Compares make and model on dockets and nameplate photos with the approved submittal, and flags substitutions.

Your team decides: The Superintendent acts on the alert. Only the nominated inspector releases a hold point.

4

See it on a live project

Ask ARK, and get the source with the answer.

Ask ARK

“Run the QC conformance check on the look-ahead for the week of September 22.”

ARK returns

Do not pour. Thursday’s Level 2 slab, zone 2B, has no pre-pour release. NCR-008 concrete at 36.1 MPa against 40, open 21 days.

ITP · Level 2 · pre-pourNCR-008 · open 21 daysLook-ahead · week of Sep 22
Quality before cover-up with ARK2 minutes. A look-ahead checked against the inspection and test plan, with a pour stopped before the release was missed.Video Library

5

Ask yourself

When did you last tear out finished work because an inspection record was missing, and who found it?

6

What ARK reads, and who it is for

What ARK reads

  • Inspection and test plans and records, in your project management platform or inspection app.
  • The NCR register, in your project management platform or CDE.
  • The three-week look-ahead, in your scheduling software or spreadsheets.
  • Approved submittals, delivery dockets and site photos.

Who it’s for

SuperintendentAn alert before the pour, not a tear-out after it.

Project EngineerTest results against the plan’s criteria, both values shown.

Quality ManagerEvery open non-conformance aged against your rule, and every delivery checked at the gate.

Project ManagerFewer tear-outs, and the inspection record complete at handover.

7

What feeds it and what it feeds

Where this sits in the project

  1. 1TenderBid Packages and Trade Scopes
  2. 2PreconstructionEstimating and Cost Intelligence
  3. 3Contract AwardContract De-Risking Before Signature
  4. 4ConstructionSubmittal Reviews and RFI Watch · Quality Before Cover-Up
  5. 5Commercial ControlClaims Support and Evidence Record · Closing the Cost Loop
  6. 6Handover and Close-outCommissioning Readiness and Handover Data

Submittal Reviews and RFI Watch feeds the approved products. Inspection and delivery records feed Commissioning Readiness and Handover Data. Back to What ARK Does

8

FAQ

Quality Before Cover-Up questions

A check where work cannot continue until a named inspector signs. ARK alerts before the work is covered if that signature is missing.
No. Only the nominated inspector can.
It compares the make and model on the docket and nameplate photo with the approved submittal and flags substitutions.
ARK enforces zero data retention with all AI providers. Your documents and queries are never used to train models. See Security & Trust.

See ARK check your look-ahead before the next pour.