Estimating and Cost Intelligence.
A price you can stand behind.
Is the price right, line by line? Before you bid, ARK checks your price against your own past jobs and finds the errors and missing items in the estimate and the quotes.

Every rate checked. Every line counted once. Every low quote explained.
Rates you can show
Every rate is checked against your own closed projects, with the source jobs named.
No line missed or doubled
ARK finds unpriced, double-counted and mistyped items and ranks them by dollar exposure.
Low quotes explained
Quotes are lined up item by item, and ARK names what a low bid left out.
1
Estimate reviewWhat is construction estimate review, and what does ARK do with it?
Construction estimate review is checking a bid price before it goes out: the rates, the quantities, the subtotals, the subcontractor quotes and the bid form. ARK does it before you bid. It checks your rates against your own closed projects, finds unpriced, double-counted and mistyped items, levels subcontractor quotes against the scope sheet, and matches the bid form to the estimate.
2
What it costs youWhat an unchecked estimate costs you
Most of your margin is set at bid. Estimators price thousands of lines in weeks, so rates come from memory, sections get missed or priced twice, and subtotals get typed in.
A quote well below the rest gets carried as a saving, and later turns out to have left out scope. The margin you thought you had was never there.
3
What ARK does, step by stepHow ARK checks an estimate
Checks the rates
Builds a cited range from your own comparable closed projects, escalated to today and adjusted for region.
Checks the lines
Finds unpriced and double-counted items, tests every rate and recomputes every subtotal, ranked by dollar exposure.
Levels the quotes
Lines quotes up against the scope sheet, puts a value on every exclusion, and names what a low bid missed.
Checks the bid form
Matches every allowance, alternate and addendum on the bid form to the estimate, and records the price assumptions.
Your team decides: The Preconstruction Manager approves the carried numbers. ARK does not fill gaps with guesses. If there is no benchmark in the record, it says so.
4
See it on a live projectAsk ARK, and get the source with the answer.
Ask ARK
“Run the estimate check on the Marrow Street bid.”
ARK returns
Steel at 7,800 per ton against a three-project benchmark. Sealants unpriced, balustrades priced twice, file total 48,000 below the bid form.
5
Ask yourselfWhere does your steel rate come from on the next bid, and could you show a board which past jobs it is based on?
6
What ARK reads, and who it is forWhat ARK reads
- Your estimate file and takeoff, in your estimating software or spreadsheets.
- The specs and drawing register.
- Trade package scope sheets and subcontractor quotes.
- The bid form and its assumptions.
- Your closed-project costs and estimating standard, in document storage and job cost history.
Who it’s for
Chief EstimatorA bid price checked line by line before it leaves the building.
Senior EstimatorEvery rate with a source job behind it, not a memory.
Preconstruction ManagerThe carried numbers, the exclusions valued, and the low quotes explained.
PresidentA margin at bid that is real, and a record of why.
7
What feeds it and what it feedsWhere this sits in the project
- 1TenderBid Packages and Trade Scopes
- 2PreconstructionEstimating and Cost Intelligence
- 3Contract AwardContract De-Risking Before Signature
- 4ConstructionSubmittal Reviews and RFI Watch · Quality Before Cover-Up
- 5Commercial ControlClaims Support and Evidence Record · Closing the Cost Loop
- 6Handover and Close-outCommissioning Readiness and Handover Data
Bid Packages and Trade Scopes feeds it the structured bid data. Its bid assumptions are what Contract De-Risking Before Signature tests the contract against. Closing the Cost Loop feeds real costs back for the next bid. Back to What ARK Does
8
FAQ