Commissioning Readiness and Handover Data.
Build the handover package as you go.
Is everything ready to hand over, so final payment is not held up? ARK confirms every system is ready to test before you book the test, and builds the owner’s asset register and close-out package as scopes complete, not at the end.

Every test ready before it is booked. Every asset recorded as it goes in. Every manual checked on receipt.
Tests ready
Every prerequisite has signed evidence and upstream systems were tested first, before the test is booked.
Assets recorded
Make, model, serial, location and warranty pulled from approved submittals and startup records into the owner’s own template.
Manuals checked
Each manual, warranty and as-built read for content, with the non-compliant ones logged on receipt.
1
Commissioning and handoverWhat is commissioning readiness, and what does ARK do with it?
Commissioning readiness is knowing that every prerequisite for a system test has signed evidence before the test is booked, and that the handover data is being built as the work completes rather than typed up in the last month. ARK checks the dependency order before a functional test is booked, builds the owner’s asset register from approved submittals and startup records in the owner’s own format, and reads every O&M manual, warranty and as-built for content before you accept it.
2
What it costs youWhat a late handover costs you
At the end of the job every building system is tested and handed over. Witnessed tests fail because an upstream report was never accepted. The owner’s asset register gets typed up from nameplate photos, and manuals are chased from trades who left months ago.
A handover package the owner rejects delays your final payment and ties your team up long after the job.
3
What ARK does, step by stepHow ARK gets you to handover
Checks test readiness
Before a test is booked, checks every prerequisite has signed evidence and upstream systems were tested first.
Builds the asset register
Pulls make, model, serial, location and warranty from approved submittals and startup records, as scopes complete.
Fits the owner’s format
Maps every asset to the owner’s own template. A field with no source is marked for clarification, never guessed.
Checks close-out documents
Reads each manual, warranty and as-built for content. A manual with no warranty section is logged non-compliant.
Your team decides: Your Project Manager approves delivery of the register and the close-out package to the owner. ARK does not invent serial numbers or warranty dates.
4
See it on a live projectAsk ARK, and get the source with the answer.
Ask ARK
“AHU-02 functional test is proposed for June 22. Are we ready?”
ARK returns
Not ready. The air balancing report is not accepted, and the chilled-water test it depends on is not until the 24th.
5
Ask yourselfHow many times did your last handover package go back to the owner, and what was missing each time?
6
What ARK reads, and who it is forWhat ARK reads
- Commissioning plan and checklists, in your project management platform or CDE.
- TAB reports and acceptances.
- Equipment schedules, submittals, startup records and nameplate photos.
- The owner’s register template.
- Manuals, warranties and as-builts, in your CDE or document storage.
Who it’s for
Project EngineerEvery test checked for readiness before it is booked.
Close-out CoordinatorThe asset register built as scopes complete, in the owner’s format.
Project ManagerA handover package the owner accepts first time, and final payment on time.
SuperintendentStartup records and nameplate photos captured once, used everywhere.
7
What feeds it and what it feedsWhere this sits in the project
- 1TenderBid Packages and Trade Scopes
- 2PreconstructionEstimating and Cost Intelligence
- 3Contract AwardContract De-Risking Before Signature
- 4ConstructionSubmittal Reviews and RFI Watch · Quality Before Cover-Up
- 5Commercial ControlClaims Support and Evidence Record · Closing the Cost Loop
- 6Handover and Close-outCommissioning Readiness and Handover Data
Submittal Reviews and RFI Watch and Quality Before Cover-Up feed it. The asset register and close-out package go to the owner. Back to What ARK Does
8
FAQ